Seeking a Safety Manager to provide Owner's Representation on the construction of a data center campus - Port Washington, WI
Minimum Required Qualifications:
- Minimum 7 to 10 years construction/safety experience in critical facilities, mission critical, semiconductor, or similar scope projects primarily for vertical building construction.
- Effective communication skills and ability to work with all levels of the project team.
- Evidence of completing OSHA 30 Hour Construction Outreach Training within the last three years. In the alternative, evidence of completing the OSHA 500 or OSHA 502 Class may be provided.
- Current First Aid and CPR training from a provider recognized by OSHA.
- Minimum of holding a valid Certified Safety Professional (CSP) or Construction Health and Safety Technician (CHST) certificate issued by the BCSP Board of Certified Safety Professionals.
- Flexibility in schedule and transportation to work at multiple sites based on assigned schedule and duties and perform time management as required to meet all the position requirements.
- Proficiency with Microsoft office and related spreadsheet and database software.
- Ability to provide management oversight on behalf of the Owner and effectively complete reporting on a daily
basis as required by the program.
Tasks and Responsibilities:
- Look ahead on high-risk activities and assisting with risk analysis of upcoming work.
- Produce daily observations and indicator/trend reports on Procure.
- Monitor compliance with site safety programs and requirements, which defines safety requirements that contractors must comply with while working as an Owner's Representative on Data Center projects.
- Perform Daily Safety reviews of work in progress in accordance with current Safety Regulations and Standard Operating Procedures (SOP).
- Conducts construction site safety audits to identify improper procedures, checks equipment and facilities for hazardous conditions and recommends corrective actions.
- Audit and review Methods of Procedures (MOPs) for safety compliance and to minimize site impacts.
- Submit Daily, Weekly, and Monthly Safety reports required by the Program.
- Monitor compliance to all current OSHA requirements that relate to the specific construction projects.
- Report to the Director of Safety, including but not limited to, attending any required meetings or providing safety reports/analysis as requested.
- Immediately notify the Director of Safety of any incident or recordable injury on projects.
- Monitor Contractor compliance with COVID-19 regulations as defined by city, state, and OSHA guidelines. Confirm that Contractor Safety Plans are complete and updated to address COVID Safety Guidelines on each project site.
- Confirm that Contractor is reporting all recordable injuries and near-miss incidents within the required timelines
and by filing the proper forms. Review the report for accuracy before filing.
- Review and provide comments to the Owner on the project-specific "Project Health, Safety & Environmental Plan" as prepared by the Owner or the Contractor.
- Perform ongoing construction site safety inspections and generate safety report for all site visits.
- Identify site safety hazards and provide immediate direction to contractor safety representative to eliminate or mitigate them.
- Perform reviews and inspections of the jobsite to assure compliance with health and safety regulations and applicable codes.
- Participate in site inspections and testing as necessary for required permits, including confined space, hot work, trenching, etc.
- Confirm that the New Hire Safety Orientation on-line safety training are available onsite.
- Confirm that contractors are performing tailgate safety meetings and training as required by their Contract and/or OSHA requirements.
- Attend pre-construction meetings to present Owner's safety program and the role of the field safety representative. Provide comprehensive safety support and guidance for Project Team.
- Monitor adherence to zero tolerance and corrective action policy for workers found not in compliance with the Program's safety policy.
- Conduct project safety stand-downs with all crews to review the incident for injuries. Educate all site workers on how to prevent a repeat accident.
Benefits Offered: